PROTECTION +CONTAINMENT

Define the playing boundary around the site.

Containment requirements vary with the surroundings, playing format and operating plan. Materials and protective finishes are confirmed after those inputs are reviewed.

What this page covers.

Perimeter

Confirm the boundary behaviour required for play and separation.

Overhead zones

Review whether additional containment is needed for the surroundings.

Site exposure

Consider local climate and maintenance conditions during selection.

Access for upkeep

Keep inspection and replacement routes in the project plan.

A clear basis for the next conversation.

Values and descriptions shown here are a coordination reference. Final dimensions and requirements are confirmed against the project location, local standards and agreed scope.

Required inputs
Playing format, surroundings and site exposure
Boundary system
Confirmed by project
Finish
Confirmed by project
Maintenance
Reviewed with the operating team